University of Missouri's Consultant Procedures and Design Guidelines Manual is intended to assist architects, engineers, design professionals, and Design/Build contractors (A/E) in understanidng the University's policies, the minimum design and submittal criteria, and the basic minimum requirements for material and products to be included in all University projects.

  • The University of Missouri Consultant Procedures and Design Guidelines are controlled from this site, unless noted.
  • The appropriate edition of the Consultant Procedures and Design Guidelines for Consultants with active UM design projects is referenced in the agreement between the University and the Consultant.
  • Consultants are responsible for downloading the standards from this site.

The manual has the following sections:

Section 1, Orientation, describes the general business relationship between the consultant and University.

Section 1.1, Orientation for Design-Bid-Build Delivery Method

Section 1.2, Orientation for Design Build Delievery Method

Section 1.3, Orientation for Construction Manager at Risk Delivery Method

Section 1.4, Orientation for Master Construction Delivery Method

Section 2, Planning and Contract Development Guidelines, list University Codes, standards, design review submittal requirements, drawing, and project manual requirements.

Section2.1, Planning and Contract Document Development Guidelines for Design-Bid-Build Delivery Method

Section 2.2, Planning and Contract Document Development Guidelines for Design Build Delivery Method

Section 2.3, Planning and Contract Document Development Guidelines for Construction Manager at Risk Delivery Method

Section 2.4, Planning and Contract Document Development Guidelines for Master Construction Delivery Method

Section 3, Design Guidelines, provides minimum design requirements to be included in all Unversity Projects.  Section 3 applies to all delivery methods.

Division Guidelines

Division 02 - Site Construction

Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Door, Windows, & Glass)

Division 09 - Finishes

Division 10- Specialties

Division 11- Equipment

Division 12- Special Construction Requirements

Division 14 - Conveying Systems

Division 21 Fire Suppression

Division 22 - Plumbing

Division 23 - Heating, Ventilating, and Air-Conditioning (HVAC)

Division 26 - Electrical

Division 27 - Telephone and Data Rooms

Division 28 - Electronic Safety and Security

Division 31- Earthwork

Division 33 - Utilities

Previous version of the Consultant Procedures and Design Guidelines

Appendices to the Consultant Procedures and Design Guidelines

The Appendices below are controlled from this site, unless noted. Consultants with UM design projects should check here for the most current version of the these documents. Most of the Appendices links are to files requiring an Adobe Reader to view. Word and ASCII (Text) files are so marked.

Reviewed 2014-07-31.