Building Inspection Program Documents
UM AHJ Code Determinations (These documents include code section clarifications or instructional information)
- Code Determination 01 - Seismic Special Inspections
- Code Determination 02 - Arc Flash Code Plan Review and Inspections
- Code Determination 03 – Use and issuance of Certificates of Occupancy
- Code Determination 04 - Extension of Temporary Certificate of Occupancy (TCO)
- Code Determination 05 - Approval of Temporary Power Services
- Code Determination 06 - Space Designation for Fire Alarm System Design
- Code Determination 07 - Permits Requirements for Existing Laboratory Spaces
- Code Determination 08 - Use of Portions of the 2017 ICC A117.1
- Code Determination 09 - Calculating Construction Valuation for Code Consultant Proposals
- Code Determination 10 - Patient Room Fire Alarm Notification
- Code Determination 11 - Design considerations in using the 2010 ADAAG and 2017 ICC A117.1
- Code Determination 12 - Approval of Temporary Means of Egress
- Code Determination 13 - Elevator Hoistway Fire Initiating Device
- Code Determination 14 – Determining Seismic Design Category and Non Structural Seismic Special Inspection requirements
Inspection Program Forms and Reports
- Building Inspection Log
- Building Inspection Report
- Building Permit Calculator
- Building Permit Form (Campus Use Only)
- Plan Code Review Form
- Code Variance Request
- Final Certificate of Occupancy (FCO)
- Permit Exemptions List
- Stop Work Order
- SWPPP BMP Inpection Form
- Temporary Certificate of Occupancy (TCO)
Reviewed 2024-04-18